Y Rail Alignment
This document is a placeholder until more content is generated.
1. Rail Stops
A. Parts
| ID |
Qty |
Description |
| PN099 |
2 |
XY Motion, Y Axis Front Rail Guide |
| PN532 |
2 |
Screw, M5-0.8 x 12mm BHCS |
| PN577 |
2 |
Washer, M5, Split Lock |
B. Steps
2. Gantry Lock Bars
A. Parts
| ID |
Qty |
Description |
| PN094 |
2 |
Misc, X Gantry Service Bar |
| PN532 |
4 |
Screw, M5-0.8 x 12mm BHCS |
| PN574 |
4 |
Tee Nut, 6mm Slot, M5, Drop In |
B. Steps
3. X Axis Installation
A. Parts
| ID |
Qty |
Description |
| PN502 |
8 |
Screw, M3-0.5 x 12mm SHCS |
B. Steps
4. Rail Alignment